Badminton hall, table tennis hall sports floor installation and maintenance methods

First, the installation of PVC plastic sports floor

Installation method is divided into movable and fixed installation

Active installation: (suitable for wooden floor ground paving and multi-purpose venues), the floor and the floor are bonded together with a special connecting belt provided by the manufacturer, and the floor is not bonded to the ground to facilitate future movement.

塑胶运动地板

Fixed installation (recommended for this installation):

(1) For partial bonding, apply 10 cm of adhesive on the floor with reference to the edge line of the floor, or connect with double-sided tape.

(2) Fully adhesive, all brushed on the floor under the floor.

1, badminton hall floor pavement method

1 The ground is clean, flat, and free from cracks and drying.

2 When the floor enters the paving site, open the paving in the same direction in the order of numbers on the package.

3 Use a straight line longer than 15.5 meters to straighten the end of floor 1 and align it with the outside of the floor line. Use the alignment line on the floor as the reference plate.

4 The construction worker stands on the datum board (to prevent the datum board from moving) and pulls the adjacent floor 2 close to align the site line. Other floors are pushed in this order.

5 Paving Modes: Mobile and Partially Mounted

Mobile installation method:

Mobile single-roller rewinding: Turn the width direction of the 3rd floor less than half, place the single-sided adhesive tape on the lower side of the 2nd floor edge, press halfway down, the other half is exposed outside, and the 3rd floor will be opened. Coming back, press on the tape that is exposed on the outside and press it tightly, peel the cover tape from any end, and pull it all the way to the other end. Then use your foot to do it. Other floors can be used as 3, 4 seams, 4, 5 seams, 1, 2 seams and so on.

Movable whole block winding: Turn the width direction of the 3rd floor less than half, use the pencil along the edge of the 2nd floor, dash to the ground, and turn the 2nd board on the side of the drawn line to a half less, Attach the pvc connection tape to the marked line and stick the transparent connection tape on both sides with adhesive tape to prevent the transparent connection tape from moving.

Mix the glue according to the ratio of 5:1 (adhesive: 5, curing agent: 1) (adjustable glue is best used in half an hour to prevent curing), scrape evenly onto the connecting belt with a scraper, both sides Leave five centimeters without squeegee (so as not to push the glue out), and finally turn the floor back onto the connecting belt. The seams are tight, other floor presses 3, 4 seams, 4, 5 seams, 1, 2 seam sequence and so on, and can be used after four hours.

Partially fixed paving method: Turn the 1st floor width direction a little less, use a pencil along the edge of the 2nd floor, dash to the ground, turn the 2nd board on the side of the draw line to a half less, put The glue brush is 15 cm wide (7.5 cm on both sides of the line) on the floor. Finally flip the floor back down. Keep the seams tight, and paste the other floors in order, and use them four hours later.

2, table tennis hall floor pavement method

1 The ground is clean, flat, and free from cracks and drying.

2 When the floor enters the paving site, open the paving in the same direction in the order of numbers on the package.

3 Paving method:

Partial fixed pavement method. Turn the floor number 1 wide by a half, use a pencil to follow the edge of the floor number 2 and dash to the ground. Turn the 2nd board on the side of the draw line to a half less, and put the glue brush on the ground. 15 Centimeters wide (7.5cm on both sides of the drawn line). Finally turn the floor back to its original position. Keep the seams tight, and paste the other floors in order, and use them four hours later.

Moving single roll winding: Turn the width of the 1st floor to a half less, place the single-sided tape on the underside of the 2nd floor, press it halfway, the other half is exposed, and place the open floor 1 Coming back, press on the tape that is exposed on the outside and press it tightly, peel the cover tape from any end, and pull it all the way to the other end. Then use your foot to do it. Other floors can be bonded sequentially and so on. It can be used after construction.

Second, the basic ground requirements

The paving surface must be flat and clean. It is recommended that the floor be self-leveling.

Lay out the floor in the numbered order, align and merge, and note that the site line should be aligned during the paving.

Open the adjacent two floors along the joints, place the special connecting belts of the manufacturer on the underside of the joints, ensure that the joints are centered and fixed, and brush the glue on the joints, first stick one of the boards. Hold one half of the strap, and then attach the other half of the strap to the other half of the strap.

1, the ground floor of the indoor venue requirements

No matter what the ground is first to ensure the ground is dry, the cement floor is required to be dry.

The cement floor requires light, no cracks, no sand, dryness, smoothness, and cleanliness.

Flatness requirement: the error per square meter is not more than 2mm

2. Ground floor requirements for outdoor grounds

No matter what the ground first guarantees the dryness of the ground, the cement floor is required to be dry.

The cement floor requires light, no cracks, no sand, dryness, smoothness, and cleanliness.

Flatness requirement: the error per square meter is not more than 2mm

The conditional units require that the ground floor of the basketball court exhibit a certain degree of slope, and the center must be about 5-10 cm higher than the two sides or be provided with drainage facilities (drainage ditch). (Indoor can be free, but pay attention to waterproof)

Maintenance:

1. It is forbidden to wear leather shoes, high-heeled shoes or easy-to-color sports shoes.

2. It is forbidden to cut and squeeze. The surface should not be rubbed with hard objects to avoid damage or breakage.

3. It is forbidden to use acid, alkali and other corrosive agents on the floor and keep away from fire and high temperature so as to avoid deformation of the floor.

Related Reading:

"Installation, Maintenance and Technical Requirements of PVC Sports Floor"